Decision category
Maintenance decisions
PM intervals, repair vs replace, and reliability ROI decisions.
- Preventive Maintenance Interval Planner Compare a current and proposed PM interval on total annual cost, not failure count alone.
- Repair vs Replace Equipment Compare the equivalent annual cost of repairing versus replacing a piece of equipment.
- Reliability Improvement ROI Test whether a reliability investment pays back within its useful life from downtime and maintenance savings.
- PM vs Run-to-Failure Comparator Compare a PM program against running the asset to failure on total annualized cost, pricing an unplanned-downtime premium over planned PM downtime.
- Shutdown Maintenance Capacity Planner Check whether a planned shutdown window has enough crew capacity to clear the maintenance backlog, applying a realistic productivity factor.
- Spare Parts Criticality Planner Decides which spare parts are worth stocking by expected downtime cost avoided, not part price alone.