Quality

Cost of Poor Quality

Expand scrap cost into the full Prevention-Appraisal-Failure total, and price the annual value of hitting a target defect rate.

Total cost of poor quality$99,000 / year
Improvement value at target$46,000
Failure cost share69.7%
Annual defective units3,000

Improvement value by target defect-rate tier

TierProposed total costImprovement value
Entered (1.00%)$53,000$46,000
0.00% defect rate$30,000$69,000
0.75% defect rate$47,250$51,750
1.50% defect rate$64,500$34,500
2.25% defect rate$81,750$17,250

Continue Analysis

Based on your results, these related decisions are available.

Resources

How this works

Scrap cost alone understates what defects really cost. Rework, warranty claims and returns, and the inspection and prevention spending already in place all belong in the real total. This engine adds them up using the standard Prevention-Appraisal-Failure structure, then prices the annual value of hitting a target defect rate by re-running the failure-cost math at the lower rate while holding appraisal and prevention spend constant, since this engine screens the value of fewer defects, not a change in inspection or prevention program size.

Key terms

  • Internal failure cost: cost of defects caught before they reach the customer (scrap, rework).
  • External failure cost: cost of defects that reach the customer (warranty, returns, complaints).
  • Appraisal cost: spending on inspection and testing to catch defects.
  • Prevention cost: spending on stopping defects from happening in the first place.
  • Improvement value: the annual savings from moving to a target defect rate, holding appraisal and prevention spend fixed.

Assumptions

  • Per-defect costs are constant regardless of volume
  • Appraisal and prevention spend don't change as the defect-rate target changes
  • One defect type or an averaged rate, not a Pareto breakdown across categories

Limitations

  • Does not model the cost of achieving the target rate itself, that belongs to Defect Reduction ROI
  • Does not break down cost across multiple distinct defect types
  • Does not model a change in appraisal or prevention spending as part of the improvement

Sources

Prevention-Appraisal-Failure cost of quality model per Juran's Quality Handbook, standard quality-costing framework.

Worked example

At 100,000 units/year and a 3% defect rate, 3,000 defective units cost $8 each in rework and $15 each in external failure (warranty, returns), for $69,000 in failure cost, plus $20,000 in appraisal and $10,000 in prevention already being spent, a $99,000 total cost of poor quality. Hitting a 1% target rate cuts defective units to 1,000, dropping failure cost to $23,000 and the total to $53,000, a $46,000 annual improvement value, without changing the appraisal or prevention spend at all.

Common use cases

  • Making the full cost of a quality problem visible beyond just scrap
  • Pricing the annual value of a proposed defect-rate improvement before investing in it
  • Comparing how much of total quality cost is failure versus appraisal/prevention
  • Feeding an improvement value into Defect Reduction ROI

Frequently asked

What is the Prevention-Appraisal-Failure framework?
It is the standard quality-cost model: prevention (avoiding defects), appraisal (inspecting for them), and failure (the cost once they occur); scrap cost alone only captures a slice of the failure category.
Why does a small defect-rate improvement matter here?
Failure costs often scale faster than the defect rate itself once rework, warranty, and customer-impact costs are included, so a modest rate improvement can produce an outsized dollar improvement.
Is this the same as the scrap cost calculator?
No, Scrap Cost prices scrap and rework specifically; this expands to the full quality-cost picture across prevention, appraisal, and failure, a broader total.
Where do the prevention and appraisal cost figures come from?
They are your own entered figures, quality department budgets, inspection labor, and similar; this does not estimate them from defect rate alone.