Generator Sizing for Operations

Size a backup generator to cover motor starting surge, not just steady-state running load, which can leave a generator unable to start its largest motor.

Motor starting surge

Fuel cost

Generator size300 kW
Fuel cost per outage$672

Continue Analysis

Based on your results, these related decisions are available.

Resources

How this works

The generator must cover all running load plus the extra surge the largest motor draws at startup, an electric motor can draw two to three times its running current for a brief moment. Its running contribution is replaced by its starting-surge contribution in the total.

Key terms

  • Starting surge factor: the multiple of running draw a motor pulls at startup, the highest instantaneous demand the generator will ever see.

Assumptions

  • Only the single largest motor's surge is modeled, not simultaneous multi-motor starts

Limitations

  • Not a full electrical one-line or transient-response study

Sources

Standard backup-generator sizing practice (motor-starting surge accounted for separately from steady-state running load).

Worked example

Sizing to the 200 kW running load alone misses that the largest 50 kW motor draws 150 kW at startup (3x surge). Replacing its 50 kW running contribution with 150 kW pushes the true requirement to 300 kW, a 100 kW undersizing the running-load-only approach would miss.

Common use cases

  • Sizing a backup generator for a facility with large motor loads
  • Checking whether an existing generator can actually start critical equipment
  • Budgeting fuel cost for planned outage events

Frequently asked

Why does motor starting surge matter more than steady-state load?
Motors draw several times their running current for a brief moment at startup; sizing to steady-state load alone can undersize a generator that then fails exactly when equipment tries to start.
What is critical load versus total facility load?
Critical load is the subset of equipment that must stay powered during an outage; sizing to total facility load instead is usually far more generator than actually needed.
Does this include fuel cost for extended outages?
Yes, runtime hours and fuel cost are both inputs, so the result includes the operating cost of running the generator for your expected outage duration, not just its sizing.
Can this also size a generator used for demand-charge management, not just backup?
The demand-charge-savings input lets this model that use case too, but the surge-sizing logic for critical load and motor starts still applies underneath either use.